Harold H. Emory
400 Spring St., Apt. 341
400 Spring St., Apt. 341
St. Paul, MN 55102
513.295.3139
513.295.3139
haroldemory.info
hemory13@gmail.com
SENIOR PIPING DESIGNER
- Over 20 years of accomplished experience in Senior Piping Design and construction project management.
- Competent in new and existing piping design with responsibilities in estimating and coordinating projects from start to finish. Complete projects on time and within budget.
- Highly skilled in piping and instrument diagrams with thorough understanding of ASME piping codes and API standards.
- Vast knowledge in machine design, nuclear power plants, marine design, pharmaceuticals and process piping design.
- Proficient with AutoCAD, CADWorx and Isogen Isometric Modeling.
- Hold Transportation Worker Identification Credential.
PROFESSIONAL
EXPERIENCE:
Koch Industries, FHR, Pine Bend, Minnesota (2013-2014)
Koch Industries, FHR, Pine Bend, Minnesota (2013-2014)
SENIOR PIPING DESIGNER
·
Key
Projects: Participated in the expansion and upgrading of the plants quality
and production.
·
Assisted in executing various projects by identifying
tie-Ins, field routing pipe through pipe rack areas from process equipment
using CADWorx and Isogen modeling.
· Lead
a group on doing an Impact Study on up and coming lifting and handling of heavy
materials over pipe rack areas. This study used isolation valves in the various
process areas using P&ID’s, Isometrics & Piping Plant Drawings.
C & I Engineering, Louisville, Kentucky (2012 – 2013)
SENIOR PIPING DESIGNER
·
KEY
PROJECTS: Marathon Oil Plants
(Wellsville, Ohio; Canton, Ohio; Kendall, Illinois)
·
Assigned to Mechanical Design Group to conduct
field walk-downs and identify tie-ins for piping upgrades. Verified field
conditions and checked for interferences to ensure feasibility of routing. Created final drawings of routing and
support design, submitting to site production for fabrication.
Florida Power and Light / Bechtel Engineering, Homestead,
Florida (2011 – 2012)
SENIOR PIPING DESIGNER
·
KEY
PROJECT: Shutdown at Turkey
Point Nuclear Station
·
Completed field walk-downs to verify
modifications of the existing environment. Measured and created final piping
drawings using AutoCAD. Used piping and instrument diagrams and specifications
for the Turbine building area, collaborating with construction personnel on
final installation.
·
Upgraded small piping projects in the Reactor
building area requiring keen knowledge and strict adherence to nuclear safety
regulations. Worked closely
between contractors and design engineers to troubleshoot and resolve design
issues.
ICM, Wichita, Kansas (2005 – 2009)
SENIOR PIPING DESIGNER
·
KEY
PROJECTS: Ethanol Plant
Designs (Siouxland Ethanol, Glacial Lakes Energy, Verson Hankinson)
·
Developed 10, 50, and 100 million gallons per
year standard equipment file by designing manufactured equipment using CADWorx
software. Contracted to reroute piping and equipment. Designed tank farm layouts with containment areas and
equipment skids for portable ammonia loading.
Cognis Corporation / Process Plus, LLC, Cincinnati, Ohio (1991 – 2004)
SENIOR DESIGNER / CONSTRUCTION MANAGER
·
KEY
PROJECTS: Piping, Structural and Civil Assignments
·
Led multiple design projects involving outages
and shutdowns in all plants regarding design, design changes, and
upgrades.
·
Recruited to direct construction teams that
included maintenance and outside contractors, soliciting bids and estimating
projects up to $700K. Created
design proposals (from P&ID’s), prepared estimates, coordinated scheduling
of contractors, and monitored safety compliance of crews.
·
Consistently completed projects on time and
within budget.
·
Resolved steam deficiency in the steam and
condensate requirements for the APG section of the plant by upgrading from a 50
psi to 90 psi system that enhanced the utility requirements.
Eli Lilly and Company / Jacobs Engineering Group,
Cincinnati, Ohio (1990 – 1991)
SENIOR PIPING DESIGNER
·
KEY
PROJECTS: Jacobs Field Design
Group for Eli Lilly Plants (Indianapolis, Indiana; Clinton, Indiana)
·
Completed field walk-downs of existing pipe,
created tie-ins, and routed pipe.
Developed isometric drawings and bill of materials.
·
Coordinated field design meetings with the
client to ensure on schedule project completion.
OTHER RELEVANT EXPERIENCE:
SENIOR PIPING DESIGNER, F & L
Smidth (Mining), Salt Lake City, Utah (2011)
SENIOR PIPING DESIGNER, Roquette
America, Keokuk, Iowa (2004 – 2005)
LEAD / SENIOR DESIGNER, Newport News
Shipbuilding (Marine), Newport News, Virginia (1988 – 1990)
SENIOR PIPE SUPPORT DESIGNER, Texas
Utilities Nuclear Power Station, Glen Rose, Texas (1980 – 1988)
EDUCATION,
CERTIFICATIONS AND MILITARY
Fairleigh
Dickinson University, Teaneck, New Jersey
College
Coursework, Urban Systems
Tarrant
County Junior College, Fort Worth, Texas
AutoCAD (two
semesters)
(TWIC)
Transportation Worker Identification Credential, 2012
U.S.
Department of Labor Mine Safety and Health Administration Certificate,
2011
- AutoCAD
- CADWorx
- CAD/CAM
United
States Army, MOS B5240 Power Man
Maintained and
operated field generators.
Stationed in Korea.
Department
of Energy and Department of Defense Clearances